Boss Zone 1 GRP tower

GRP Tower supplied by Ridgeway
The Boss Zone 1 tower is the world’s premier Glass Reinforced Polymer – GRP (glass ) industrial modular access tower system.  It is a lightweight scaffold tower system for use in Zone 1 applications where aluminium or steel systems are either unsafe or unsuitable.  You can use the Boss GRP Zone 1 tower for access solutions either inside or outside.… Read More

Ridgeway Breakfast Morning to Celebrate Tower Safety Week

PASMA Tower Safety Week focuses around raising awareness of the most common dangers seen on site when working with towers. At Ridgeway we welcome the opportunity to demonstrate safety while working at height. Falls from height are still one of the major causes of injury within the workplace and PASMA and Ridgeway work continually to reduce accidents on mobile access towers through training, education and raising awareness.

Read More

PASMA and HSE Join Forces at Ridgeway!

PASMA and HSE

As a proud member of PASMA we recently held a Tower Workshop at our training facility in Belfast. Organised by the Health & Safety Executive and delivered jointly by PASMA and HSE, the workshop proved to be a great success. HSE inspectors from all over the province heard Claire Bruce of the HSE’s Ashford-based Safety Unit, and Don Aers, PASMA’s…

Read More

Access Tower Keeps Cost of Going Up Down

The Ridgeway on site services team run by Karl Crockard have recently completed a stunningly fast turnaround on a contract for an easy access platform to roof level for solar panel installation. The Instant span aluminium scaffolding is made in Ireland by Instant Upright and has been distributed exclusively by Ridgeway for 45 years. This specialist manufacturer are world famous for…

Read More

Our Aluminium Scaffolding Preferred Product Again

Ridgeway’s aluminium scaffolding system was the preferred product of choice once again for a recent project in Greenisland. The decision to redecorate a Church interior presented a number of potential issues. The pews currently in place would have required dismantling and use of a steel system would have exceeded load restrictions on the floor. A Span 400 system with Spandeck…

Read More