103 Airport Road West
Belfast
SAT NAV - BT3 9ED
Ridgeway
| Contact |
+44 (0) 28 9045 4599
AdvanceGuard | Tower Systems | Chimney Scaff | Spandeck | Safesite | PPE Safety | Low Access | Special Apps | On Site Services |
Flowforge | Woven Mesh | GRP | Ridgeclamp | Weldmesh | Perforated Metal | Expanded Metal | Stairtreads and Handrailing | Press Gratings |
Archformers | Beads and Laths | Metpost | Structural Fixings | Wall Starters | Joint Bed Reinforcement |
Industrial Spraying | Contractors | Spray Booths | Graco | Applications | Aqua Blaster | Training |
Access | Ballcourts | Permanent | Temporary/Hoarding | Traffic Barriers | Alleygates | Toppings/Accessories | Installers | Specify |
Concertainer Gabions | Concertainer Trapions | Concertainer Bastions | Rock Netting | Weldmesh Mattresses | Kyowa Filter Units |
Land | Marine | Wind |
subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link

ridgeway real news initiative

 
Instant Span scaffolding at Belfast hotel - Ridgeway

12 August 2009 Instant span cleans up
at Belfast's Park avenue hotel


The Park Avenue Hotel, one of Northern Ireland's leading four star hotels commissioned Ridgeway Plant of Belfast to supply and erect a façade access system which will be used to give the hotel's façade a summer facelift. The hotel which is located in the vibrant Belmont area of Belfast, less than 2 miles from Belfast City Hall, wanted to clean its act up this summer by giving the complete façade of the building a power wash and a lick of fresh paint. The project is estimated to take two to three weeks to complete.

As preferred suppliers to the Park Avenue Hotel, Ridgeway Plant supplied and erected the Instant Span System. Constructed from heavy-duty, lightweight aluminium, Span 400 is easy to handle and fast to erect. Taking a team of just 4 assemblers the 8 metre façade (each side was a run of circa 30m) took just 1 day to complete - almost half the time it would have taken to erect a traditional steel scaffold.

Ridgeway's Marketing Manager explains, "The alternative solution was steel scaffold which would have been considerably costlier and would have had weight implications for the supporting roof. Instant's System F can provide the hotel contractor with a safe and effective work platform at less cost".

 

About Us | Site Map | Privacy Policy | Contact Us | © 2011 Ridgeway